Craig delivered a full screen-printing setup into Cheriton, loading a drying rack, exposure unit, and industrial shelving from Polegate Central. The whole job took just under three hours door-to-door, with the loading alone running an hour. The dropoff was a ground-floor unit with double doors and easy access, which made unloading the larger items straightforward. Craig had the tail lift on hand and got everything positioned ready to use.